Work / Product name
Qty, pcs
Implementation period
11
Design, manufacturing, supply, commissioning and start-up of soft starter units PN-TTE-140-380-P21-UHL4
2
2016
12
Major overhaul, installation, commissioning, and start-up of the SSTE‑2100‑465‑2.5‑UHL4 thyristor excitation system, unit No. 11
1
2016
13
Development of a working project for replacing the excitation system of TG-3
—
2016
14
Manufacturing, installation, commissioning, and start-up of the backup excitation control system for TG-1
1 set.
2016
15
Development of a working project for replacing the electromechanical exciter of TG-1 (60 MW) with a thyristor excitation system
1
2015
16
Design, manufacturing, supply, and commissioning of the thyristor excitation system equipment SSTP-3500-465-2.5-UHL4 for the TGV-300 turbo generator, unit No. 1 (in cooperation with PJSC “Zavod ‘Preobrazovatel’)
1
2015
17
Design, manufacturing, installation, commissioning, and start-up of inverter excitation systems for TG-3 and TG-4: SNVTG‑315‑115‑2‑I‑UHL4; SNVTG‑400‑115‑2‑I‑UHL4
2
2014
18
Design, manufacturing, commissioning, and start-up of a galvanic technological complex consisting of V-TPV2-3150/3150/12-P-UHL4
2
2014
19
Development of diagnostic software for the galvanizing line
1
2014
20
Development of a working project for replacing exciters of turbo generators No. 3 and 4
1
2014